Skip to main content

Jun 17th, 2016

Mechanical, Electrical, Fire System Replacement and Upgrades

Featured Image

Share this story

  • Email
  • Copy Link
  • Facebook
  • Twitter-X
  • LinkedIn

[cmsms_row data_width=”boxed” data_padding_left=”3″ data_padding_right=”3″ data_color=”default” data_bg_color=”#ffffff” data_bg_position=”top center” data_bg_repeat=”no-repeat” data_bg_attachment=”scroll” data_bg_size=”cover” data_bg_parallax_ratio=”0.5″ data_color_overlay=”#000000″ data_overlay_opacity=”50″ data_padding_top=”0″ data_padding_bottom=”50″][cmsms_column data_width=”1/2″][cmsms_image align=”center” animation_delay=”0″]6155|https://www.och-lco.ca/wp-content/uploads/2016/06/mechanical.jpg|full[/cmsms_image][/cmsms_column][cmsms_column data_width=”1/2″][cmsms_text animation_delay=”0″]

The project includes:

  • Furnaces
    505 St Laurent
  • Piping – 251 Donald St. (Phase 1)
  • Domestic Water Boilers
    507 Riverdale
    2080/2100 Russell
    Gladstone Terrace
    1065 Ramsey
  • Makeup Air Units
    303 King Edward
    Strathcona Heights Wiggins
  • Fire Alarm Systems
    Bellevue Manor
    Somerset Towers
    St. Laurent Place

Investment
Estimated investment ~$3,7M.

Status :
In progress

**The above list identifies some of the communities selected as priorities in the 2016 Capital Works program. Please note that these are  subject to re-evaluation and re-prioritization as new information arise throughout the year. Comeback often for updates.

[/cmsms_text][/cmsms_column][/cmsms_row]

Back to top